Composite
Part:BBa_K102121
Designed by: Wayne Materi Group: iGEM08_Alberta_NINT (2008-10-27)
The output test harness provides a means to visibly detect when a gate is activated. It consists of a Lac promoter (which is induced by IPTG throughout the test to act as a constitutive promoter) followed by the gate then an RBS and LacZα. In order to test activity the activation of the gate by its correct input is compared to that from a “null” input using a standard LacZ assay.
[edit]
Categories
Parameters
None |